Live demo
DefendX M32 Dashboard Simulation
A full walkthrough of the DefendX M32 browser dashboard, populated with demonstration data for a 32-panel industrial campus.
Interactive Product Simulation — Demonstration Data
Nothing on this page is connected to real hardware. All values, events and controls are simulated for demonstration purposes only.
32
Total panels
30
Online
26
Normal
1
Fire
2
Fault
1
Supervisory
2
Offline
P01
Administration Block
Building A – Ground Floor
Last update: 2 seconds ago
P02
Reception & Lobby
Building A – Ground Floor
Last update: 2 seconds ago
P03
Server Room
Building A – First Floor
Last update: 2 seconds ago
P04
Training Centre
Building A – Second Floor
Last update: 2 seconds ago
P05
Canteen Block
Building A – Ground Floor
Last update: 2 seconds ago
P06
Quality Laboratory
Building B – Ground Floor
Last update: 2 seconds ago
P07
Production Block
Building B – Ground Floor
Last update: 2 seconds ago
P08
Production Block Mezzanine
Building B – Mezzanine
Last update: 2 seconds ago
P09
Packing Hall
Building B – First Floor
Last update: 2 seconds ago
P10
Finished Goods Store
Building C – Ground Floor
Last update: 2 seconds ago
P11
Raw Material Store
Building C – Ground Floor
Last update: 2 seconds ago
P12
Warehouse
Building C – First Floor
Last update: 2 seconds ago
P13
Dispatch Bay
Building C – Ground Floor
Last update: 2 seconds ago
P14
Boiler House
Utility Yard
Last update: 2 seconds ago
P15
Compressor Room
Utility Yard
Last update: 2 seconds ago
P16
Chiller Plant
Utility Yard
Last update: 2 seconds ago
P17
Diesel Generator Room
Utility Yard
Last update: 2 seconds ago
P18
Utility Building
Utility Yard
Last update: 18 seconds ago
P19
Electrical Substation
Utility Yard
Last update: 2 seconds ago
P20
Pump House
Fire Water Yard
Last update: 2 seconds ago
P21
Fire Water Tank Area
Fire Water Yard
Last update: 2 seconds ago
P22
Workshop
Building D – Ground Floor
Last update: 2 seconds ago
P23
Maintenance Store
Building D – Ground Floor
Last update: 2 seconds ago
P24
Tool Room
Building D – First Floor
Last update: 2 seconds ago
P25
R&D Centre
Building E – First Floor
Last update: 2 seconds ago
P26
Pilot Plant
Building E – Ground Floor
Last update: 2 seconds ago
P27
Solvent Store
Building E – Yard
Last update: 2 seconds ago
P28
Security Gate House
Main Gate
Last update: 2 seconds ago
P29
Staff Hostel Tower 1
Residential Zone
Last update: 18 seconds ago
P30
Staff Hostel Tower 2
Residential Zone
Last update: 2 seconds ago
P31
Medical Centre
Residential Zone
Last update: 2 seconds ago
P32
Central Control Room
Building A – Ground Floor
Last update: 2 seconds ago
Live event timeline
- 14:32:10FIRE ACTIVEP07 — Production Block
NORMAL → ACTIVE · acknowledged by Control Room Operator
- 14:32:11RELAY ACTIVATEDR01 — Common Fire Relay
OFF → ON · acknowledged by System
- 14:32:15FIRE ACKNOWLEDGEDP07 — Production Block
UNACKNOWLEDGED → ACKNOWLEDGED · acknowledged by Control Room Operator
- 14:35:42COMMUNICATION LOSTP18 — Utility Building
ONLINE → OFFLINE · unacknowledged
- 14:36:03COMMUNICATION RESTOREDP18 — Utility Building
OFFLINE → ONLINE · unacknowledged
- 14:41:17FAULT ACTIVEP12 — Warehouse
NORMAL → ACTIVE · unacknowledged
- 14:44:52SUPERVISORY ACTIVEP21 — Fire Water Tank Area
NORMAL → ACTIVE · unacknowledged
- 14:48:09PANEL POWER FAILUREP26 — Pilot Plant
PRESENT → ABSENT · unacknowledged
System snapshot
- Network health
- Nominal
- Active relays
- 3 of 16
- Storage utilization
- 38% (60-day margin)
- M32 uptime
- 41 d 06 h 12 m
- Connected web clients
- 7
Simulated actions
Try the Demonstration Controls
These controls change simulated data only. They are not connected to real hardware.
Demo buzzer: sounding (simulated) · Events: unacknowledged
